Statement of Work Example: A Sample You Can Copy

November 27, 2026 · 5 min read

Short answer

Here is a complete statement of work for a small website project, written in plain English. Copy the shape, change the details, and you have a solid first draft for your own job.

Sample statement of work

The business and people below are made up. Replace every detail with your own.

  • Project: Website refresh for Brightside Dental. Prepared on January 6 by Jordan Lee Design for Brightside Dental.
  • Purpose: Make it easier for new patients to find the office and book a visit online.
  • Scope of work: Redesign 6 pages (Home, Services, About, Team, Reviews, Contact). Add an online booking button that links to the office's existing booking system. Set up the page titles and descriptions for search.
  • Not included: Writing the page text, taking photos, a logo redesign, a blog, paid advertising and ongoing site updates after launch.
  • Deliverables: The finished 6-page website, live on the client's hosting, and a 30-minute video showing how to edit text.
  • Timeline: Work starts January 13 after the deposit and the client's text and photos arrive. Design preview January 27. Launch February 24.
  • Client responsibilities: Send text and photos by January 13. Reply to each preview within 3 business days.
  • Price and payment: $6,000 total. $3,000 deposit before work starts, and $3,000 before launch. Invoices are due within 7 days.
  • Revisions: 2 rounds of changes on the design preview, and 1 round after the site is built. Extra rounds are $85 an hour.
  • Acceptance: The client has 5 business days after launch to report problems. The work is accepted if no problems are reported, or after they are fixed.
  • Changes: New pages or features are quoted in writing and start only after the client approves the quote.
  • Signatures: Both sides type or sign their name and the date.

Why each part is there

  • Purpose keeps everyone aiming at the same goal if details change
  • Not included is the cheapest protection against scope creep
  • Dates and client responsibilities stop waiting on the client from becoming your delay
  • The payment schedule lines up cash with the work, so you are never far ahead of what you have been paid
  • The acceptance step gives the project a clear end, so the final payment can be due
  • The changes line turns a new request into a priced change instead of a favor

How to adapt it to your work

  • Swap the deliverables for the things you actually hand over
  • Change the revision count to what you are comfortable with
  • Use your own hourly rate for extra work
  • Add a line for anything that has caused trouble before, like late payments
  • Keep the sentences short, so the client reads and understands them

Check it before you send it

Read it as if you were the client, and ask whether anything could be read two ways. Words like and more, as needed and ASAP are red flags. You can paste it into the free scope checker to find missing sections. If the project is large or unusual, have a lawyer review it.

Skip the blank page.

Type your messy notes and ScopeFast writes a ready-to-sign scope in 30 seconds. Your first one is free.

Create my free scope →

Free templates to start from

Get new templates and guides by email

Leave your email and we will send you new scope of work templates and short tips for stopping scope creep. No spam. Reply to any email to unsubscribe.

More guides

This guide is general information, not legal advice. Every project is different, so have a lawyer review large or unusual agreements.