Carpentry Scope of Work Template (Free Example)

Custom woodwork is built to order, so changes after cutting are expensive. A written scope locks the drawing, the materials and the finish level before any wood is cut.

Quick answer

Should I take a deposit for custom woodwork?

Yes. Custom pieces are hard to resell, so a deposit that covers materials is standard. Put the amount and the dates in the scope.

Skip the copy and paste.

Type your messy notes and ScopeFast writes a scope like this one for your project, checks it for risky wording and gives you a ready-to-sign PDF. Your first one is free.

Make my custom carpentry & woodworking scope free →

Example: custom carpentry & woodworking scope of work

Scope of work

Build and install custom built-in bookshelves along one living room wall

What's included

  • ✓A design drawing for the client to approve
  • ✓3 floor-to-ceiling units built from paint-grade plywood and poplar trim
  • ✓Install and anchor to the wall studs
  • ✓Fill, sand and prime all surfaces
  • ✓2 adjustable shelves per unit
  • ✓Clean-up of the work area

What's not included

  • ✕Final paint coats (the client or their painter does these)
  • ✕Electrical or lighting inside the units
  • ✕Removing existing furniture or trim
  • ✕Wall repair behind the units
  • ✕Additional units beyond the 3 listed

Revisions

1 round of changes to the drawing before building. Changes after building starts are billed at $75 an hour plus materials.

Timeline

About 5 weeks: 1 week for the drawing, 3 weeks of building in the shop, 1 week of installation.

Fee and payment

$7,500 total. 30% ($2,250) to start the drawing, 40% ($3,000) when building starts, 30% ($2,250) after installation.

Changes and extra work

Added units or different materials are quoted in writing first.

Approval

Client signature: ____________________   Date: __________

Tips for carpenters and woodworkers

Questions

How do I handle design changes after building starts?

Say that the drawing is final once approved, and that later changes are billed at a stated hourly rate plus materials.

Scope creep stops here.

Turn your notes into a professional scope of work in 30 seconds.

Create my free scope →

Get new templates and guides by email

Leave your email and we will send you new scope of work templates and short tips for stopping scope creep. No spam. Reply to any email to unsubscribe.

Client asked for something extra?

Put it in writing before you start. Use a free change order template so extra work gets approved and paid.