Handyman Scope of Work Template (Free Example)

Handyman visits grow because there's always one more thing to fix. A task list with a time limit keeps the day on track and the extras paid.

Quick answer

Should a handyman charge by the hour or the job?

A flat price for a listed set of tasks plus an hourly rate for extras works for most people.

Skip the copy and paste.

Type your messy notes and ScopeFast writes a scope like this one for your project, checks it for risky wording and gives you a ready-to-sign PDF. Your first one is free.

Make my handyman scope free →

Example: handyman scope of work

Scope of work

One-day handyman visit: 8 small home repairs

What's included

  • ✓Fix the sticking bedroom door
  • ✓Re-caulk the bathtub
  • ✓Mount 2 shelves and 1 TV on the wall
  • ✓Patch and paint 4 small wall holes
  • ✓Replace 3 light switch covers
  • ✓Fix the loose stair handrail

What's not included

  • ✕Tasks not on the list (billed at $75 an hour)
  • ✕Materials over $100 without approval
  • ✕Plumbing, electrical or roofing work that needs a license
  • ✕Moving heavy furniture
  • ✕Large drywall repair

Revisions

If something we fixed fails within 30 days, we come back and fix it free.

Timeline

One day, about 8 hours, on a date agreed in advance.

Fee and payment

$600 for the day, plus materials at cost. Paid at the end of the visit.

Changes and extra work

New tasks added during the visit are agreed on the spot and billed by the hour.

Approval

Client signature: ____________________   Date: __________

Tips for handymen

Questions

What should be in a handyman scope of work?

The task list, materials, time estimate, exclusions, rate for extras, guarantee and how payment works.

Scope creep stops here.

Turn your notes into a professional scope of work in 30 seconds.

Create my free scope →

Get new templates and guides by email

Leave your email and we will send you new scope of work templates and short tips for stopping scope creep. No spam. Reply to any email to unsubscribe.

Client asked for something extra?

Put it in writing before you start. Use a free change order template so extra work gets approved and paid.